update

11/4/2013

0 Comments

 
It's been about 3 weeks since the last visit and most of the work has been with wiring etc and so visually  there has been no great leap forward like our last visit.  Summary:
  1. rear wheel carrier has been fitted and installed with electric winch
  2. the hot water system  installed beneath the chassis with a stone shield
  3. the wiring for lights, power points, actuators etc installed
  4. inverter, battery charger and solar regulator installed
  5. power board wired above the fridge
  6. the rubber seal - sock - between truck cab and house body attached
  7. the alloy body trims and roof edging have been welded, laser cut (where necessary) and sent for powder-coating
  8. exterior led lighting - custom made - as no 24v lights were found that suited
  9. all kitchen cupboards trims etc have been cut and are ready to assemble
  10. all the accessories eg toilet, laminate, solar panels, water filter, leather for seats have arrived.
0 Comments



Leave a Reply.

    Author

    We are in our mid-50's and it's time to mostly give up work - maybe after we pay for
    zatruck!

    Archives

    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013

    Picture

    Categories

    All
    Bed
    Bike Friday
    Colour
    Floor Frame
    Kitchen
    Lockers
    Power
    Roof
    Rubber Boot
    Shower And Toilet
    Solar Panel
    Toilet
    Water
    Wheel Carrier

    RSS Feed

Hope you enjoy the site!